QA Process | Major Control Plan |
1. Supplier Assessment | Sample test, First Article Inspection, Factory audit, Pilot run, Qualified suppliers assessment |
2. Incoming Inspection | Supplier lot outgoing data, Incoming lot audit, Material pretest, FIFO control |
3. In Process Quality Control | Mixing, Coating, Pressing, Slitting, Assembly, Injection, Formation, Forming, Aging test, OCV Test, 100% X-ray inspection, Final Visual inspection, Packing. |
4. Outgoing | Lot Sampling Inspection, Data check for each outgoing lot, Packaging Inspection, Inspection and scanning before Shipment |
5. Reliability & Safety | Cycle test, Discharge Rate Test, High/Low temperature Discharge Test, High Temperature Storage Test, Humidity and Thermal cycle Test, Over-charge and over-discharge Test, Short-circuit Test, Heating Test, Impact, Test, Drop Test, Nail Penetration Test, Projectile Test. |